WEBVTT

1
00:00:00.800 --> 00:00:05.813
Here is how SnapCOST reviews a fit-out
project for a shopping mall’s seventh-

2
00:00:05.813 --> 00:00:06.985
floor office zone.

3
00:00:07.285 --> 00:00:13.758
Floors, walls, glass partitions, ceilings,
building services and furniture extracted

4
00:00:13.758 --> 00:00:18.458
from drawings build up room by room to
complete the 3D model.

5
00:00:18.758 --> 00:00:24.434
Every element links to one of 19 space
codes in the tree on the left, keeping the

6
00:00:24.434 --> 00:00:27.447
model and bill of quantities (BOQ)
aligned.

7
00:00:28.247 --> 00:00:34.788
Inside Office Area 1, you can review
workstations, the modular ceiling and

8
00:00:34.788 --> 00:00:37.352
lighting layout at eye level.

9
00:00:37.653 --> 00:00:43.499
The key plan at the upper left shows the
camera’s position on the drawing and its

10
00:00:43.499 --> 00:00:44.798
viewing direction.

11
00:00:45.597 --> 00:00:52.336
The overview shows how offices, meeting
rooms and support spaces fit together.

12
00:00:52.636 --> 00:00:56.984
The full-floor rendering reflects the same
seventh-floor layout.

13
00:00:57.284 --> 00:01:02.313
The low-partition workstation layout shown
here in the 3D view of Office Area 1

14
00:01:02.613 --> 00:01:08.609
also appears in its rendering when you
select the same space code in the CG tab.

15
00:01:08.909 --> 00:01:14.549
The large meeting room model includes
timber louvers, a long meeting table and

16
00:01:14.549 --> 00:01:15.778
glass partitions.

17
00:01:16.078 --> 00:01:20.748
Its rendering shows the same finishes and
furniture arrangement.

18
00:01:21.048 --> 00:01:26.398
Select the space code for a small meeting
room or the pantry to open its rendering.

19
00:01:26.698 --> 00:01:31.261
For the north corridor, compare the 3D
view and corridor rendering side by side

20
00:01:31.261 --> 00:01:32.589
to review the finishes.

21
00:01:33.389 --> 00:01:37.264
Now select individual elements to check
the basis for their quantities.

22
00:01:37.564 --> 00:01:43.613
Select a low-partition post to see its
properties and CXD connection status in

23
00:01:43.613 --> 00:01:44.854
the right panel.

24
00:01:45.154 --> 00:01:53.447
Click a glass-wall face to calculate its
area of 2.4984 m² and perimeter of 7,198

25
00:01:53.447 --> 00:01:53.754
mm.

26
00:01:54.054 --> 00:02:02.566
Hold Shift and add the adjacent face: the
totals become 4.9476 m² and 14,360 mm in

27
00:02:02.566 --> 00:02:03.604
perimeter.

28
00:02:03.904 --> 00:02:11.153
Wall sections work the same way. Selecting
several sections adds their areas and

29
00:02:11.153 --> 00:02:14.506
perimeters, here totaling 17.4744 m².

30
00:02:14.806 --> 00:02:22.412
The floor of Office Area 1 is selected as
one face, showing an area of 247.9898 m²

31
00:02:22.412 --> 00:02:24.081
and its perimeter.

32
00:02:24.881 --> 00:02:29.026
The interior-finish quantity takeoff
organizes these quantities by finish

33
00:02:29.026 --> 00:02:31.751
material and room, with supporting
calculations.

34
00:02:32.051 --> 00:02:38.032
Export the project’s 252 items for the
current scope as PDF or Excel, or as a

35
00:02:38.032 --> 00:02:40.518
draft purchase-order Excel file.

36
00:02:40.818 --> 00:02:49.697
In the BOQ tab, Office Area 1 has 33 line
items grouped by trade, totaling KRW

37
00:02:49.697 --> 00:02:50.949
52,728,342.

38
00:02:51.249 --> 00:02:57.852
Each line includes material, labor and
expense unit rates, calculation details

39
00:02:57.852 --> 00:02:59.037
and CXD links.

40
00:02:59.337 --> 00:03:05.593
Use the export menu for quantity takeoff
sheets and the selected space’s BOQ in

41
00:03:05.593 --> 00:03:07.018
PDF, Excel or CSV.

42
00:03:07.317 --> 00:03:13.625
Export the full cost estimate as one file,
including its cover, summary, cost

43
00:03:13.625 --> 00:03:17.558
calculation, room totals and unit-rate
analyses.

44
00:03:17.859 --> 00:03:24.661
The Deliverables tab creates six project-
wide documents: design proposal, design

45
00:03:24.661 --> 00:03:30.708
drawings, BOQ, quantity takeoff, work
specification and finish schedule.

46
00:03:31.008 --> 00:03:36.289
The cost calculation builds up materials,
labor and expenses item by item using

47
00:03:36.289 --> 00:03:39.431
applicable rates, showing formulas and
amounts.

48
00:03:39.730 --> 00:03:45.664
Hiding walls during review leaves
quantities and costs unchanged. Use

49
00:03:45.664 --> 00:03:48.416
Restore View to bring them back.

50
00:03:49.217 --> 00:03:54.718
The Specs tab lists the finish materials
for Office Area 1, with specifications,

51
00:03:54.718 --> 00:03:56.919
unit prices and material images.

52
00:03:57.219 --> 00:04:01.200
Furniture and lighting fixtures are listed
by item in the same table.

53
00:04:01.500 --> 00:04:08.710
The Custom Furniture tab breaks down KRW
6,749,627 in joinery costs into materials,

54
00:04:08.710 --> 00:04:13.141
fabrication, delivery and installation,
and profit.

55
00:04:13.442 --> 00:04:20.481
Select pantry joinery or office storage in
3D to open elevations, plans, sections,

56
00:04:20.481 --> 00:04:23.829
dimensions and quantities in one panel.

57
00:04:24.629 --> 00:04:29.271
For design-change reviews, selecting a
ceiling element shows service-change

58
00:04:29.271 --> 00:04:31.994
impacts and the linked information
required.

59
00:04:32.294 --> 00:04:39.639
Enter a proposal to raise the ceiling by
200 mm, from 2,700 to 2,900 mm.

60
00:04:39.939 --> 00:04:46.658
Select Office Area 1’s one-way cassette AC
unit: one ceiling-panel overlap is found.

61
00:04:46.658 --> 00:04:51.137
Ceiling height stays on hold pending
piping information.

62
00:04:51.437 --> 00:04:57.576
The four-way cassette is reviewed in the
same way. Costs remain unconfirmed without

63
00:04:57.576 --> 00:04:59.277
supporting information.

64
00:04:59.577 --> 00:05:05.643
The CXD element-change review groups
equipment relocation with items in the

65
00:05:05.643 --> 00:05:11.223
same room, estimating a partial scope at
KRW 4,186,600 including VAT.

66
00:05:11.523 --> 00:05:16.003
Value-engineering (VE) options use
separate branches for comparison,

67
00:05:16.003 --> 00:05:20.219
preserving the baseline and keeping
confirmed BOQ data separate.

68
00:05:21.019 --> 00:05:26.451
SnapCOST links drawings, 3D models,
quantities, the BOQ and deliverables

69
00:05:26.451 --> 00:05:30.902
through shared space codes for a connected
review workflow.

70
00:05:31.202 --> 00:05:35.736
That concludes this SnapCOST
demonstration. Thank you.